Production Ergs with Power Meters will have two load cells (1 for each side) which are warrantied for one year from date of purchase. Replacement Load Cells are sold individually and can be installed on either side. Instructions and tools included.
Load Cell – Replacement
$99.00
The Load Cell is responsible for measuring and relaying the workout data to the Power Meter.
Reviews
There are no reviews yet.